Share this project

Done

Share this project

Done
Design the Starship Enterprise Science Research Mock Up project video thumbnail
Replay with sound
Play with
sound
$31.00 pledged of $313,550 goal
backers
By Henry Fales
$31.00 pledged of $313,550 goal
backers

About this project

Enterpirse EFF-1101 Science Demonstrator Mock Up
Enterpirse EFF-1101 Science Demonstrator Mock Up

I want to Design, Develop and some day build a Starship Enterprise mock up as a research laboratory & test bed for safe scientific studies and advancements in design. Once a Spaceship leaves orbit, there currently is no back up ship for rescue. In the spirit of Star Trek, Designing a Larger Space Ship as a mock up, would allow for a Safe place to do research and development of the systems that are needed for long-term space flights. Collage students could use this vehicle as a means to experience the effects of long-term confinement, just like a military submariner. We don't need to experience anymore space shuttle type disasters. To be able to design the Starship Enterprise for use as a mock up It has to have real engineering. Engineering that meets aerodynamic and space shuttle quality systems. Using these systems for long duration's will help to design more robust and reliable systems for the future without endangering lives. If I can successfully design the Starship Enterprise then I believe we can attain the funding to build it. The Starship Enterprise once built will pay for itself through grants, tourism, and colleges donations for student access. But I need Commercial level software to Design and do virtual aerodynamic testing and stress analysis. The price of this software can surprise those who are not in the design or engineering field. The software I'd like to use is called Solidworks.

Here is a Demo of Solidworks Stress Simulation Software.

A complete Commercial package runs about $75,000 Dollars
This Is a List of the needed Software.
Professional versions
Solidworks Premium 3D/2D Software = $8,000
Solidworks Electrial software = $10,000
Solidworks Simulation software = $11,000
Solidworks Flow Simulator =$14,000
Solidworks Plastics software = $15,000
Solid works PDM CAD editor = $1,800
Solidworks PDM contributor = $1,300
Solidworks PDM viewer = $3,000
Solidworks composer = $6,000
Solidworks sustainability = $3,000
Sales tax = 4% = $2,924

I believe that if I can work on this full time. I can achieve the first phase of the design. The first phase includes the outer Hull and basic interior walls, flooring, structural supports and bridge.
With the Solidworks software I'll be able to run test analysis for stress and part tolerance stack up etc.

With the Solidworks software I'll be able to Create a video that will show the assembly of all the Phase One components. The second video will be a virtual tour of the Enterprise with full color graphics.This is one of the Solidworks packaged software capabilities. I'll be able to Design and Install parts in an virtual environment that can be immediately stress tested through the use of this software.  

Basic Frame work for the Enterprise.
Basic Frame work for the Enterprise.

My YouTube Introduction Video.

The future of space travel is now in the public's hands. We are the ones who will be sending the next ships to the Moon or Mars. If we want this to happen sooner than later continued research is needed. I want the Starship Enterprise to be the tool that helps that research happen.

Other expenses that made up the request figure.
posters $5.00 each x 5000 $25,000
t-shirts $6.50 each x 5000 $35,000
Decals $0.20 each x 5000 $1,000
Oversized post card
$.80 each x 5000 $4,026
Shipping fees $6.50 x 5000 X $32,500
Company for producing gifts Total = $97,526
http://bestofmainecorp.com/
.

 Office equipment
Office desk, Work station computer &  Printer = $5000

Amount needed for me to quit my job and work
full time on designing the Enterprise = $100,000

First structural design phase
Wages $70,000
Employer FICA tax $4,900
Insurance = $18,000
One year of office space = $7,100

Travel expenses for fund raising and technology Gathering. = $20,000
AeroCon West 2014
http://www.canontradeshows.com/expo/aerocon13/ana_index.html02/11/2014 - 02/13/2014
Anaheim Convention Center
800 West Katella Avenue
Anaheim, CA 92802
Space Tech Expo 04/01/2014 - 04/03/2014
Long Beach Convention & Entertainment Center
Hall C300 E. Ocean Blvd.Long Beach, CA 90802
The 25th anniversary celebration for AeroMat 2014
will take place next June at the Gaylord Palms Resort & Convention Center.
Orlando Florida.AIAA Propulsion and Energy Forum and Exposition
Cleveland Convention Center
300 Lakeside Avenue, Cleveland, OH 44113

Kickstarter Processing fee 5% =  $15,000

Grand total for first year of operations
equal $298,550
+ Kickstarter fee = $313,550
Divided by 5000 people would be $62.71

The Enterprise! we will have to be very economical in designed.
Living space will be more like a submarine than like a hotel room.

Your bed may simply be a sleeping bag and some Velcro to hold it  against the wall in zero gravity.
Closet space may consist of a 3 foot by 6 foot locker.

The weight of any Space plane is a critical factor. Designing the Enterprise to Aviation standards is part of the Scientific study for long-term space flight. Once the basic Vehicle is designed.
We then need to design all of the internal systems to support life on-board the Enterprise. This would be the second phase of the engineering process. Things such as Carbon scrubbers and water recycling. Flight instruments and list goes on and on.
This is what makes this project so special! Designing all these systems for a larger sized Space Craft allow for discoveries to improve and or redesign things that don't work as well as we had hoped or planned.

The Military and Commercial Complex wants to spend $14 Billion dollars in the near future on Drone technology. NASA is promoting old fashioned vertical rockets for future flights to the space station. I want to start the design of a new direction. The Enterprise EFF-1101 project will be the tool to change minds and attitudes towards future space missions.

Working full time on this project, I believe that I can accomplish the first phase of the engineering with in 5 to 6 months. This is an ambiguous goal that can only be accomplished with professional level CAD Software. My goal is to have phase one accomplished by May or 2014.
Once the design has been accomplished I'll be able to produce two videos using the software package. One that is a step by step assembly of the Enterprise. The second a virtual tour showing the internal compartments such as the bridge and cafeteria etc. These Video's will take an additional 2 to 3 weeks to produce and distribute.

I am committed to work as hard as necessary to accomplish the goals I have set forth. This is only the beginning of a great and beneficial project. The Enterprise EFF-1101 will have benefits for everyone involved.  

Risks and challenges

The biggest challenge to this project is time and commercial level software. With out enough funding to work full time it could takes years to accomplish.
Life always has a way of interrupting those projects you want to do on the side. Working on this project full time will allow me to focus on it without interruptions.
I have been designing and building since I was a young teen. You can get an Idea of the work I've already done by visiting the Enterprise Federation Foundation Website (www.enterprisefederation.com). I am no stranger to working 12 hour days 7 days a week to meet a schedule or a dead line.
Having worked in the Aerospace industry, this becomes a normal part of life.

Learn about accountability on Kickstarter

Questions about this project? Check out the FAQ

Support this project

  1. Select this reward

    Pledge $1 or more About $1.00

    Starship Design Submissions
    Everyone who donates is eligible to submit graphic designs for the gifts listed.
    If this sounds like fun, Please submit your Idea to
    enterprisefederation@aol.com We would like
    gift's graphics to have a more personal touch.
    Graphics need to be submitted by the end of this campaign.

    Less
    Estimated delivery
    1 backer
    $
    Kickstarter is not a store.

    It's a way to bring creative projects to life.

    Learn more about accountability.
  2. Select this reward

    Pledge $5 or more About $5

    An oversize post card thanking you for you donation.

    Less
    Estimated delivery
    Ships to Anywhere in the world
    0 backers
    $
    Kickstarter is not a store.

    It's a way to bring creative projects to life.

    Learn more about accountability.
  3. Select this reward

    Pledge $10 or more About $10

    Thank you post card and Custom Decal sticker

    Less
    Estimated delivery
    Ships to Anywhere in the world
    0 backers
    $
    Kickstarter is not a store.

    It's a way to bring creative projects to life.

    Learn more about accountability.
  4. Select this reward

    Pledge $30 or more About $30

    Reward 1 & 2 plus 18" x 24" Poster of Enterprise's Phase One Hull design.

    Less
    Estimated delivery
    Ships to Anywhere in the world
    1 backer
    $
    Kickstarter is not a store.

    It's a way to bring creative projects to life.

    Learn more about accountability.
  5. Select this reward

    Pledge $60 or more About $60

    Rewards 1,2 & 3 plus Custom order T-shirt.
    You will receive an order form for size and color.
    T-shirts will be ordered through
    http://bestofmainecorp.com/
    if you would like to view their product line.

    Less
    Estimated delivery
    Ships to Only United States
    0 backers
    $
    Kickstarter is not a store.

    It's a way to bring creative projects to life.

    Learn more about accountability.
  6. Select this reward

    Pledge $120 or more About $120

    All rewards listed above Plus Video Presentation of the Finished Enterprise Hull Design and Panel discussion of the Enterprise's design specifications on a DVD.
    Donators outside the US can receive Video through E-Mail.
    Gifts 1-4 will ship as soon as available.

    Less
    Estimated delivery
    Ships to Only United States
    0 backers
    $
    Kickstarter is not a store.

    It's a way to bring creative projects to life.

    Learn more about accountability.
  7. Select this reward

    Pledge $250 or more About $250

    All the above Plus a Second DVD Video.
    The Second Video will be a virtual tour of the Enterprise both inside and out with a discussion of the type of research that can be done aboard the Enterprise to benefit future space travel.

    Donators outside the US can receive Video through E-Mail.
    Gifts 1-4 will ship as soon as available.

    Less
    Estimated delivery
    Ships to Only United States
    0 backers
    $
    Kickstarter is not a store.

    It's a way to bring creative projects to life.

    Learn more about accountability.
  8. Select this reward

    Pledge $500 or more About $500

    All the above plus receive E-mail updates with progress photos and graphics to follow along in the First Design Phase of the Enterprise.

    E-mailed updates will begin in December.

    Less
    Estimated delivery
    0 backers
    $
    Kickstarter is not a store.

    It's a way to bring creative projects to life.

    Learn more about accountability.
  9. Select this reward

    Pledge $1,000 or more About $1,000

    All the above Plus:
    Become a voting member of the foundation. Having Involvement with the next mission focus.
    Participate in Web cast discussions for avenues to achieve our next goals.
    Discussions will begin in March to set focus and goals for next year.

    Less
    Estimated delivery
    0 backers
    $
    Kickstarter is not a store.

    It's a way to bring creative projects to life.

    Learn more about accountability.

Funding period

- (45 days)