Share this project

Done

Share this project

Done
Fund the retool from metal to plastic of several items and sets!
759 backers pledged $80,676 to help bring this project to life.

Update #73 sorry for the long silence

Posted by tre manor (Creator)
1 like

  Hey everybosy,

  I apologize for the long silence again. Unfortunately there is still nothing positive to report. I am still sat waiting for product to be delivered. Ed informs me that they are getting a lot of stuff ready though so hopefully veyr soon I will receive the last shipment needed to finish out fulfillment. Until then we are all just waiting though. I assure you that Kristy and I are both workign very hard to have thigns ready to rock and roll as soon as the missing product arrives.

   Cheers,

   Tre'

Update # 72 Shipping has resumed!!!.............for now

Posted by tre manor (Creator)
2 likes

 hey Everybody,

   Well I wish I had better news. We have resumed shippign what we can. We received a package of metal weapons sprues for the Hordesmen and riders today and we are right now packing more orders. However we are still out of bits sprues for the war staff and Conradt. We are also out of Yrsa and one of the Gynnade KRigare bodies. We have 20 some odd packages ready to go now and we are packign whatever else we can as well.

   Ed and I spoke at length earlier this week and went over the needs that be to get this thign finished up, He assured me that they are workign hard to get thsi done and I thank them for it.

    Once those 20 are shipped we have a little less than 200 orders left to go. Don't let than number discourage you though! We have items packed into MANY boxes already and we are only awaiting a few parts to finish this thing up. We are close enough now that when the ball gets rollign again the progress will be rapid.

   As always I do thank you very mush for your continued patience with us in the final stages of fulfillment here. this KS has been hard on all of us and I have learned a lot from it. Hopefully i have not worn your patience too thin or broken it entirely.

   Best Regards,

   Tre'

update # 71 counting counting counting and some packaing and some shipping

Posted by tre manor (Creator)
5 likes

  hey Everybody,

   Sorry fro the logn silence. We received another package from Ed the other week just as we were departing to go out of town to Reaper HQ. The visit was great but ran a little longer than we expected and we have been counting counting counting ever since and packing and shippign what we can. We are now out of the metal weapons for teh hordesmen and riders ( again ) which is causing the latest hold-up. The metal weapons were ordered from Valiant btu unfortunately there was a mislabeling that ended up with me receiving 500 castings of the Gynnade Krigare  Left Handed weapons sprue instead of the Hordesmen weapon sprue. We have since made the correction and the hordesmen wpn sp should be en route to me next week at which point we will resume shipping until we run out of the next items. 

   We are currently counting all items so as to give Ed a list of exactly what is left. That should be finished by monday. Hopefully the remainder o fth eneeded items will be alogn shortly so that we can finally call this thing done! I am sure that both Ed and I will dance a jig when that day comes.

    Cheers Y'all!

   Tre'

Update # 70 Waiting again.......and some bad news.

Posted by tre manor (Creator)

  hey everybody,

    I am going to be posting updates every week relating ht estate of the fulfillment from here until the effort is finished. We have now shipped some 75 or 80 packages since my last update and are now awaiting delivery of the metal bits for the Gynnade Krigare War staff, the next run of heads for the Hordesmen and the metal weapons bits for the Conradt models. As soon as Ed delivers to me I can then deliver to you. Please bear with us for just a little longer as we finally get this disaster sorted out.

    Also we are not going to be able to remake the horse molds. Ed can explain it better than I but suffice it to say that time, money, and resources no longer allow for the corrections to be made. I can no longer let these orders sit and wait we must finish delivering while we still have the money to do so. We appreciate your patience with us and we also appreciate your frustration at the delays and discrepancies. I never set out to disappoint you guys and it shames me to my core that this Kickstarter has devolved as it has. Thank you for your backing and please accept my humble most heart felt apologies for the disappointment

  Sincerely,

   tre' manor

Update # 69 Hordesmen weapons are IN!!!!!!

Posted by tre manor (Creator)

  Hello Everybody,

   first I a must apologize fro teh delay. We lost our computer about 2 weeks ago and had to wait for our new laptop to be delivered, Now I just have to come to grips with working the laptop. The good news today is that the Hordesmen weapons and shields are in! This means we are able to ship many more orders, However we are also now running out of the metal options bits for Ulbrecht the soulless. We are working to resolve this issue as quickly as possible. Being that this option sprue is in metal it should not take very long at all to get these items in stock. Ed is working very hard as well to get thsi taken care of.

   as of right now i am looking at 25 packages that we will be taking to the PO today. i will notify you through the KS system that your rewards have shipped later today. Beyond these 25 we are working to get as many other orders packed and shipped as we are able. I know it has been a very long road but please bear with us just a little further.

    Again, Thank you very much for your support and your continued patience.

   Cheers,

   Tre'