What is Kickstarter? We’re the world's largest funding platform for creative projects. Learn more!

  • Don't want to forget? Click the star to add this project to your profile.

    1. Missing_thumb
      Michael Goldenberg on May 14

      I still haven't received my package or even the email from mega gps with confirmation info, can someone please update me on my specific status please?

    2. Fb_profile_picture.thumb
      Will Oltman on May 11

      I had similar difficulties as Div3r5ity connecting two pots back to back even using the included pucks. It works... okay... however it seems that the puck steel thickness perhaps isn't thick enough to overcome the repelling magnets embedded in the pots.

      Another thing I noticed (and perhaps this was only with the poster included in my box) that the hole pattern on the printed (1:1) poster was slightly off from the plastic bracket. You don't want your customers perforating their walls needlessly... luckily I spotted this before I began drilling.

      the products look pretty good, some of the plastic has flow/swirl marks in the plastic and the parting line on the cups could be a little cleaner... these are some things you may wish to discuss with your vendor.

      overall I'm pleased though... good luck with your company

    3. Logo photo.thumb
      Urbio on May 9

      @Rob Dahl - Thanks for sending us the photos. We are looking into how the packaged was damaged that much. We will keep you posted.

    4. Logo photo.thumb
      Urbio on May 9

      @Div3r5ity - If you use the wall puck that was included, you can attach two different pots to each side of the puck, which connects them. Try it out!

    5. Missing_thumb
      Div3r5ity on May 9

      on the video it says you can attach the pots to each other and set on desk. has anyone be able to do this because my pots wont attach.

    6. Missing_thumb
      Div3r5ity on May 9

      @rob dahl did you get the $200 large wall mount kit? can you verify what you got in the box? was it what was promised or more items?

    7. Missing_thumb
      Rob Dahl on May 8

      Sadly, I received my shipment today.
      The box was received open by the USPS and retaped Label marked as such. But not after damage to several of the plates (scratched and dented) and 3 cups where broken and just thrown in. The installations screws where loose in the box as well. Did not count them, but assume there are some missing as well. There is only 1 metal screw for a lot of wall plugs. There are only 4 magnets.

      The cardboard box (was very thin) for shipping a large mount kit) was torn down the seams like the box was thrown or just dropped. Suggest rethinking your packaging strategy.

      I hope that your get the shipping stuff down.

    8. Missing_thumb
      Holly Harris on May 7

      Finally got my Urbio...and with additional product, as promised, for the delays in production/shipping. Bummer it took so long to arrive but it shows integrity that at least they were transparent about delays and did something to make it right. Imagine the pressure of starting a business and having 818 opinionated bosses to report to. I bet whatever frustration backers felt isn't nearly what the Urbio team felt. Wishing Urbio more success moving forward.

    9. Missing_thumb
      Ernest Liu on April 7

      @Misty: Well then, let's hope the Urbio team can pull through and get you friend her (or his) Christmas present soon!

    10. Missing_thumb
      Misty on April 6

      Lol Ernie.. Just saw your comment. I try to avoid this page as much as possible so as to avoid more disappointment ....I purchased this $200 urbio garden as a gift for someone.... For christmas 2011. No, im not in any great need for "shiny new things" as you sputtered out. I do look like an arse telling that person "your gift is coming"...for 4 months now.....hopefully they will have it by Christmas 2012.

    11. Fb_profile_picture.thumb
      Will Oltman on March 27

      Is your estimate still on track?
      Production ready for ship
      Mar. 27, 2012

    12. Missing_thumb
      Greg Henderson on March 22

      Thanks for taking time to do it right. I the pathway of great design orients firms that have frustrated many as they got the product right before release, like apple.

    13. Nacillustration1.thumb
      Jess Zimbabwe on March 22

      Ewww. That earthbox on amazon is ugly!

    14. Missing_thumb
      Ernest Liu on March 7

      @clwaller: My comment was clearly directed towards those who jumped into the pledge to "buy pretty shiny things." Some quick, trivial deduction of the existing comments will reveal that most frustrated backers are concerned about getting their goods.

      So no, I am not "overreacting" when supporters make inquiries for updates, since I do the same. And pardon me for being so frank, but I found it necessary to make it clear that Kickstarter is not an online mall. Lastly, it is probably wise to note that your interest in marketing studies are not universally held by all backers.

    15. Blackdragon_400.thumb
      clwaller on March 7

      It's not buying one off Amazon. It is showing that the competition for this product is growing. It's okay not to be first to market if you have a better product. But West Elm put a pricey one out. Amazon is carrying a cheaper one. How much market is there? I would like to see the marketing studies, how delays changed those, what share is anticipated now. I think you may be overreacting to anyone who asks questions about the business, the product, or it's marketing plan. Iwe come to Kickstarter to see those insights, not to buy pretty shiny things. So who's the fired up one? That would be you.

    16. Missing_thumb
      Ernest Liu on March 3

      It is silly to see individuals getting so fired up about not having their products yet. Seriously - if you were so eager to get some wall-mounted pots, why did you come to Kickstarter? Go ahead and buy one off Amazon with your fancy 2 day shipping. If you pledge to a Kickstarter project solely for the backer incentive, then YOU are an epic fail. I suppose this properly summarizes my response to your aggravation: http://en.wikipedia.org/wiki/Facepalm

      Urbio Team, thanks for taking the proper amount of time to ensure we end up with quality items!

    17. Fb_profile_picture.thumb
      Eduardo on February 23

      I can't believe the amount of whining around such a simple and straightforward issue... designing and PRODUCING a quality product takes TIME!

      GO URBIO TEAM!!!! Please, don't rush it. Not mine, at least... :))

    18. Missing_thumb
      Misty on February 9

      In a world surrounded by Fed ex, Amazon 2 day shipping and the "have to have it now mentality", you all are an epic fail. Had your 818 backers known when contributing that they would not receive their product until ONE YEAR LATER, you would probably have 3 backers...and those would be your parents. A version of this product is already being distributed and sold at major stores all over the US. And guess what, you can get it in two days shipping! Not a year! Again, I do understand its a start up, but all the kickstarters I have supported, months after you, have already built, created and shipped the products out. In a year, you could have built a factory from ground up in America and had your products distributed by now. Instead of sending us updates with broken promises from China, don't let us know when its arriving, because its obvious, you guys are not really sure, nor confident. This aggravation is not worth an "extra shorty pot".

    19. Missing_thumb
      josh cramer on February 7

      I'd like to believe i'll receive my product in April/May but somehow I highly doubt it. Still trying to be hopeful.

    20. Nacillustration1.thumb
      Jess Zimbabwe on January 31

      Happy new year. Hope all is going well with Urbio.

    21. Missing_thumb
      Div3r5ity on January 20

      so how many extra shorty pots will the $200 backer pledge get?

    22. Missing_thumb
      Misty on January 18

      Before the holidays. Before Christmas. Sometime in February. Sometime in April. I understand this is a startup and many mistakes are happening. However don't promise anything if you don't have an accurate eta. It's very frustrating. And in the real world it's a fantastic way to loose all your investors/ supporters.

    23. Logo photo.thumb
      Urbio on January 17

      Absolutely correct Spencer... thank you for the support! We just received our delivery date last Friday when we placed our first production order. It all comes down to product quality. As designers and businessmen, it was our highest priority to assure that the product you receive will exceed your expectations. It took us round after round of product samples to achieve the quality we required. We've arrived and now with you, we're looking forward to receiving our first production parts and shipping them to all of you in April! Yes, it took us longer than we expected, but the product quality we've achieved is worth it!

      Beau.

    24. Missing_thumb
      spencer chang on January 17

      I want to leave a note of encouragement. Good job on raising so much money and getting things off the start. For those that are angry with the time and lack of news, they must not be aware of how long these development process take. when backing, you are not buying from an established store, you are helping someone start a company and develop a product. and for RUSS SCHMITT if the project was funded in May 10 2011 how have u backed it for a year already?

    25. Missing_thumb
      JUAN MANUEL BARRERA on January 17

      We backed this project since MAY, and we still have no deadline for the delivery, nothing is clear in this process, we have hear many stories from URBIO, but none of them end up being true. I´m still waitting for the "detailed Urbio update is our #1 priority this week! " posted on January 3??? I think that giving out the REAL information will give us an idea on where are we standing with this project, specially for us the international buyers!! Please give us the truth, we have been waitting for this product like 8 months, an we want answers.

    26. Missing_thumb
      Russ Schmitt on January 15

      I think I have learned my lesson with my backing of projects on here. Like this one Have Yet to see anything in the year I have backed projects.

    27. Fb_profile_picture.thumb
      Will Oltman on January 12

      The project has been dragging on for so long that people may already be knocking you off. Just saw these in the new West Elm catalog which has a striking similar form factor to your skinny pots.
      http://www.westelm.com/products/shane-powers-ceramic-wall-planters-c669/…

    28. Fb_profile_picture.thumb
      Brian Connelly on January 6

      ", we've hit a few speed bumps, such as manufacturing, magnets, engineering and now, funding.."

      Wow -- that's some detail for your backers. How about a real update now that it's 8 months with nothing but marketing updates -- nothing of substance.

    29. Logo photo.thumb
      Urbio on January 3

      Hey Kickstarters,

      A detailed Urbio update is our #1 priority this week!

      We'll be discussing timeline, manufacturing, distribution and a sweet bonus for your patience. As you can imagine, we've hit a few speed bumps, such as manufacturing, magnets, engineering and now, funding... but we're pushing along! Excitement and awareness is growing for Urbio as it's seen publication in Entrepreneur Magazine, InTouch and a few others. Pre-orders are still being accepted on our website and continue to pour in. That's all good news, but we want you to know that our kickstarter supporters are our top priority and will be receiving the very first production run of Urbio!!!

      We're looking to place our initial production order within the next two weeks. The first order will fulfill our kickstarter.com orders and myurbio.com pre-orders up to date. Once ordered, we can expect to see product from our manufacturer within 60 days of placement.

      For those looking to purchase more product, the best way to order Urbio is to pre-order our products on www.myurbio.com.

      Thank you for your patience! Like you, I have the perfect spot picked out for Urbio and I can't wait to grow my vertical garden.

      As a token of our appreciation, we'll be offering a "thank you" bonus to our kickstarter backers. What would you like to receive? Product? Gift card on future Urbio products? What are your ideas? We'll do what we can... You can post comments here or reach us at: info@myurbio.com

      Thank you!

      Beau and the Urbio Team.

    30. Missing_thumb
      c c on December 29

      and with that new press, shouldn't we get an update on where the project is?!!

    31. Ks.thumb
      Chris Hardeman on December 27

      Sabrina Soto just did you guys right again and highlighted the Urbio in the latest issue of In Touch Magazine.

    32. Fb_profile_picture.thumb
      Brian Connelly on December 27

      I have blasted a couple of other projects for similar issues --- This project showed a lot of promise from the start -- but from there it just dropped. This project is now on my list of failed projects. We are not getting anything of value for our contributions -- we were supposed to be able to follow the process of the company -- instead we get nothing.

      I would say this project has been the source of some major disappointment.

    33. Dsc_0750.thumb
      Tyler Pew on December 17

      Jason C.
      You put it perfectly!
      Just checking to see if Urbio team is still around?
      Would love to have a ETA.
      Thanks

    34. Photo_6.thumb
      Jason Caldeira on December 15

      *tap tap tap* This thing on? Other projects I've backed have been blasted for their lack of updates, and they're updating on a considerably greater frequency than you guys. It's time to step it up and let us know where our money went. Thanks.

    35. Missing_thumb
      Misty on December 1

      so these will not be arriving before the holidays as planned right? Is the new ETA now February?!?!

    36. Missing_thumb
      JUAN MANUEL BARRERA on November 16, 2011

      It has been a long time with no updates!! when are you shipping URBIO???

    37. Fb_profile_picture.thumb
      Brian Connelly on November 15, 2011

      Updates? It's time.

    38. Missing_thumb
      sinerge on October 19, 2011

      Based on update #7 this project is behind schedule. What's the new ETA? I've got any empty wall I've been waiting to fill.

    39. Avitar 2.thumb
      Anders Minken on October 3, 2011

      Dear Urbio Team! For sure I don't mind waiting if that is what it takes. It's silence I don't like. Following you guys in work, success and occasional difficulties is part of the fun for us backers - and gives the final result an added value for us. Please update? Please!

    40. Missing_thumb
      allisonrusso on September 25, 2011

      When will urbio be sent?

    41. Missing_thumb
      Jeff on August 26, 2011

      Any updates?

    42. Missing_thumb
      Jeff on June 2, 2011

      Were you going to get our addresses and ask which pots we wanted?

    43. Missing_thumb
      Stefanie on May 31, 2011

      When are you guys planning on sending out your survey? I was really looking forward to this project?

    44. Logo photo.thumb
      Urbio on May 9, 2011

      Ernest,

      We've designed a really fun instructional booklet that folds out into a super cool poster! It'll be included in all kickstarter orders :) 17 hours remaining... spread the word!

    45. Missing_thumb
      Ernest Liu on May 9, 2011

      Do you guys plan on including any sort of booklet or pamphlet for plant suggestions? The ones you've used for the demo look great!

    46. Logo photo.thumb
      Urbio on May 6, 2011

      Thanks for spreading the word!!!

    47. Logo photo.thumb
      Urbio on May 6, 2011

      Sinerge,
      Thanks you so much for your pledge! As we are still in negotiation with our manufacturer, we still do not have final pricing. One of our goals is for Urbio to be attainable to most consumers and we will continue to strive to keep the cost as low as we can, while maintaining product integrity and trusty magnetics.

    48. Logo photo.thumb
      Urbio on May 6, 2011

      SJ, thank you SO much!!!

    49. 004e.thumb
      Sj Heckscher-Marquis on May 5, 2011

      I really love this idea; I'm looking forward to buying more of your exciting products.

818
Backers
$77,434
pledged of $15,000 goal
0
seconds to go

Funding Successful

This project successfully raised its funding goal on May 10, 2011.

Pledge $1 or more Pledge $1 or more

25 Backers

Get a BIG thank you from the Urbio team.

Pledge $20 or more Pledge $20 or more

167 Backers

Small Pot Kit. Includes 1 small pot, and 1 single wall mount puck. International shipping add $4

Pledge $40 or more Pledge $40 or more

196 Backers

Medium Pot Kit. Includes 1 small pot, 1 medium pot, and 3 single wall mount puck. International shipping add $8

Pledge $80 or more Pledge $80 or more

118 Backers

Large Pot Kit. Includes 2 small pots, 2 medium pots, and 6 single wall mount puck. International shipping add $16

Pledge $120 or more Pledge $120 or more

86 Backers

Medium Wall Mount Kit. Includes 2 small pots, 2 medium pots, 4 wall mount plates, and 4 single wall mount pucks. International shipping add $24

Pledge $200 or more Pledge $200 or more

216 Backers

Large Wall Mount Kit. Includes 4 small pots, 3 medium pots, 1 Large Pot, 9 wall mount plates, and 6 single wall mount pucks. International shipping add $40

Project By

Logo photo.large

Connected as Jared Aller (401 friends)

Urbio Vertical Garden is the magically magnetic urban vertical garden. Go to www.myurbio.com for more information. Thanks!

  1. myurbio.com
  2. enlisteddesign.com